Shenzhen, Guangdong, China / 2015
International Competition
Client: Shenzhen Energy Environmental Engineering Co., Ltd
Land Area: 218 ha
Construction Area: 267.000 m2
Type of Project: Planning of a waste incineration power plant
With the rapid growth of Shenzhen, this waste-to-energy plant aims at setting up a model by tackling the garbage siege problem in a low-carbon way.
In order to set that example and make it acceptable for the neighborhoods, we propose to:
- emphasize the existing natural landscape with the camouflage of the green plant nestled in the valley, behind the headquarter set as focal point;
- organize environmental educational functions including a well-planned tour, with the plant's exhibition window interacting with the headquarter.